Time to do some typing instead of nailing! So much has gone on since the roof made tiny D safe from the snow. By now it’s rain not snow.
I’ll break this down into three posts so the timeline makes some sense.
The electric panel went into the finished framing and the water and drain pipes were installed. The vent pipe for the drains goes through the roof (that’s,it behind my feet in the last picture). It get’s filled with water for testing and inspection. The water pipes get filled with air for testing.